Cellulose II nanocrystal particles and preparation method and use thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11149095
APP PUB NO 20190330378A1
SERIAL NO

16475921

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Cellulose II nanocrystal particles have a crystallinity ≥80%, a number-average molecular weight ranging from 1200 to 2500, and a molecular weight distribution coefficient Mw/Mn≤1.30. The cellulose II nanocrystal particles can be prepared by: subjecting a cellulose raw material to an amorphization reconstitution and then to a crystallization acidolysis. The crystallization acidolysis may be carried out under a low concentration acidic condition. The method enables high efficient and clean production and quality control of cellulose nanocrystal materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INSTITUTE OF METAL RESEARCH CHINESE ACADEMY OF SCIENCES110016 NO 72 WENHUA ROAD SHENHE DISTRICT LIAONING SHENYANG SHENYANG CITY LIAONING PROVINCE 110016

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Zhiyu Liaoning, CN 33 204
Yan, Yukun Liaoning, CN 2 0
Zhang, Jinsong Liaoning, CN 56 284
Zhou, Yangtao Liaoning, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00