Tire assembly, tire monitoring system, and tire monitoring method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11148480
SERIAL NO

16514706

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a tire assembly includes a tire, a power generating body disposed inside the tire, and an electronic device that receives supply of power that is output from the power generating body. The power generating body includes a first insulating film, a second insulating film, a first electrode, and a second electrode. The first insulating film has a first surface. The second insulating film has a second surface. The first and second electrodes have conductivity. The power generating body is configured such that a true area of contact between the first surface and the second surface changes according to deformation of the tire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO RUBBER INDUSTRIES LTDKOBE CITY JAPAN HYOGO CENTRAL CRISP BANG TOWN 3 CHOME 6 NO 9 KOBE-SHI HYOGO
THE SCHOOL CORPORATION KANSAI UNIVERSITY3-35 YAMATE-CHO 3-CHOME SUITA-SHI OSAKA 564-8680

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ochi, Jun Kobe, JP 11 91
Tani, Hiroshi Suita, JP 54 254

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00