Combine with a pre-thresher

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11147214
APP PUB NO 20200404851A1
SERIAL NO

16453005

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A harvesting machine including a cutting head configured to provide cut crop for threshing. The harvesting machine includes a conveyer disposed adjacent to the cutting head and configured to move the cut crop to be threshed along a path. A thresher is configured to thresh the cut crop to provide threshed grain from the cut crop. A separator is disposed adjacently to the thresher and is configured to separate debris from the threshed grain. A feed accelerator is disposed between the conveyor and the thresher, wherein the feed accelerator is configured to advance the cut crop along the path from the conveyor to the thresher. A pre-threshing device is disposed adjacently to the feed accelerator, wherein the feed accelerator interacts with the pre-threshing device to provide threshed grain, and the pre-threshing device is configured to collect the threshed grain before the remaining cut crop is threshed at the thresher.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brammeier, Tyler S East Moline, US 6 64

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00