Threshing section of a combine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11147213
APP PUB NO 20200214215A1
SERIAL NO

16238996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A threshing section for a combine harvester includes a rotor and a transition cone. The rotor has an axis of rotation, a downstream end, and an upstream end. The upstream end includes one or more blades for moving crop downstream in a direction of crop flow. The transition cone at least partially surrounds the upstream end of the rotor and the blades. An annular space is formed between a swept profile of the blades and an interior surface of the transition cone through which crop is introduced into the threshing section. A cross-sectional area of the annular space, which is measured in a radial direction, is substantially constant along at least a portion of a length of the swept profile.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLUE LEAF I P INC1100 N MARKET STREET 4TH FLOOR SUITE 4010 WILMINGTON DE 19890

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kemmerer, Benjamin New Holland, US 27 69
Lesher, Joshua Bernville, US 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 19, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 19, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 19, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00