Dynamic maximum frequency limit for processing core groups

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11144085
APP PUB NO 20180373287A1
SERIAL NO

15632000

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus system is provided which comprises: a first component and a second component; a first circuitry to assign the first component to a first group of components, and to assign the second component to a second group of components; and a second circuitry to assign a first maximum frequency limit to the first group of components, and to assign a second maximum frequency limit to the second group of components, wherein the first component and the second component are to respectively operate in accordance with the first maximum frequency limit and the second maximum frequency limit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Rawi, Asma H Hillsboro, US 1 5
Ardanaz, Federico Hillsboro, US 23 153
Eastep, Jonathan M Portland, US 27 192
Gupta, Nikhil Hillsboro, US 242 2425
MacNamara, Chris Co. Limerick, IE 74 968
Shapira, Dorit Atlit, IL 23 112
Sistla, Krishnakanth Beaverton, US 38 596
Srinivasan, Vasudevan Hillsboro, US 60 433

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 12, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 12, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 12, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00