Drive apparatus having oil passage defined in stopper body

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11136975
APP PUB NO 20190219052A1
SERIAL NO

16323633

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pump includes an external gear, an internal gear surrounding the external gear to mesh with the external gear, a pump chamber to house the internal gear and the external gear, a suction inlet to suck an oil into the pump chamber, and a discharge outlet to discharge the oil from inside the pump chamber. The housing includes an outer cover having the pump chamber defined therein, and a first oil passage defined in the outer cover and connected to the discharge outlet. The motor shaft includes a second oil passage connected to the first oil passage, and a first through hole to connect the second oil passage to the motor shaft. The second oil passage opens into the first oil passage at the end portion of the motor shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIDEC CORPORATION338 KUZETONOSHIRO-CHO MINAMI-KU KYOTO-SHI KYOTO 6018205 ?6018205

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishikawa, Yuki Kyoto, JP 111 365
Yamaguchi, Yasuo Kyoto, JP 196 3217

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 5, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 5, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 5, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00