Method for producing an integral bridge, and integral bridge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11136733
APP PUB NO 20200248414A1
SERIAL NO

16641575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first arch and second arch are produced in respective first and second structural portions. Each arch has a tie rod interconnecting the foot points of the arch, where a foot point of the arch is displaceably mounted. Each tie rod is tensioned so that horizontal forces caused by the weight of the arches at the foot points of the corresponding arch, are taken up by the tie rods. A first end point of the tie rod of the first arch is connected in a force-fitting manner to the first abutment, and a second end point of the tie rod of a last arch is connected in a force-fitting manner to the second abutment. The remaining adjoining end points of the tie rods are connected to one another in a force-fitting manner, and corresponding foot points of the arches are connected in a force-fitting manner to the abutments and pillar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNISCHE UNIVERSITAT WIENKARLSPLATZ 13 1040 WIEN 1040

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gassner, Georg Rossatz, AT 1 0
Kollegger, Johann Klosterneuburg, AT 9 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 5, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 5, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 5, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00