Managing power usage in an industrial process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11131482
SERIAL NO

16989236

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power system includes a first solar power assembly that includes a first working fluid fluidly coupled to one or more components of an industrial process; a second solar power assembly that includes a second working fluid fluidly coupled to an electrical power generation system that is electrically coupled to the one or more components of the industrial process; and a heat recovery system that includes a heat exchanger. The heat exchanger includes an inlet fluidly coupled to at least one of the one or more components of the industrial process to receive waste heat from the at least one of the one or more components of the industrial process, and an outlet fluidly coupled to at least another of the one or more components of the industrial process to supply the waste heat to the at least another of the one or more components of the industrial process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Ugla, Ali Abdulaziz Dhahran, SA 10 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00