Centrifugal pump

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11131318
APP PUB NO 20190277303A1
SERIAL NO

16296947

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A centrifugal pump that includes an inlet chamber having a distal end portion and an opposing proximal end portion with a longitudinal axis spanning therebetween. Further included in the centrifugal pump is a plenum chamber having an inlet end portion and an outlet end portion, the inlet end portion is in fluid communication with the inlet chamber proximal end portion, the outlet end portion having an aperture that is about a radial axis that extends radially a distance outward from the longitudinal axis. Wherein operationally for the centrifugal pump the inlet chamber and the inlet and plenum chambers are rotated about the longitudinal axis wherein a fluid is drawn through the distal end portion toward the proximal end portion and ultimately discharged therethrough the aperture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WEBB DANIEL SCOTTGREENWOOD VILLAGE CO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Webb, Daniel Scott Greenwood Village, US 3 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00