High performance coatings for building panels

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11130871
APP PUB NO 20180002531A1
SERIAL NO

15637997

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed to dirt and anti-microbial resistant articles that include a substrate, a powder coating applied to the substrate, the powder coating may include a cross-linked polymeric binder. The powder coating may include a blend of metal borate and a sulfur-containing benzimidazole compound, wherein the metal borate and sulfur-containing benzimidazole compound are present in a weight ratio ranging from about 75:1 to about 10:1. The powder coating may include fluorosurfactant and a fluorosurfactant may be applied to the powder coating in an amount ranging from about 0.01 g/m2 to about 4 g/m2. The powder coating may be formed using a liquid-based fluorosurfactant.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AWI LICENSING LLC1105 NORTH MARKET STREET SUITE 1300 WILMINGTON DE 19801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Caldwell, Kenneth G Mountville, US 34 251
Masia, Steven L Lancaster, US 23 20
Wang, Michelle X Lititz, US 42 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00