Reduced-power electronic circuits with wide-band energy recovery using non-interfering topologies

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11128281
SERIAL NO

16569060

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described herein are reduced-power electronic circuits with wide-band energy recovery using non-interfering topologies. A resonant clock distribution network comprises a plurality of resonant clock drivers that receive at least one of a plurality of reference clock signals. An energy saving component is coupled with the plurality of resonant clock drivers. The energy saving component provides for lower energy consumption by resonating with unwanted parasitic capacitance of a load capacitance. The energy saving component and the load capacitance (LC) form a series resonant frequency that is significantly greater than a clock frequency of the plurality of resonant clock drivers, so that output clock signal paths are not interfered with and so that effects on skew are minimized.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REZONENT CORPORATIONLOS ALTOS CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bezzam, Ignatius Los Altos, US 12 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00