Wheel and cycle
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Sep 21, 2021
Grant Date -
Sep 26, 2019
app pub date -
Nov 27, 2018
filing date -
Mar 20, 2018
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
The disclosure relates to the field of cycle technologies, and particularly to a wheel and a cycle. The wheel comprises a rim, a tire covering an outer periphery face of the rim, and a friction power device sandwiched between the rim and the tire; wherein the friction power device can produce a frictional current when pressed by the rim and/or the tire.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
BOE TECHNOLOGY GROUP CO LTD | CHAOYANG DISTRICT BEIJING |
International Classification(s)

- 2018 Application Filing Year
- H02K Class
- 3041 Applications Filed
- 2200 Patents Issued To-Date
- 72.35 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Du, Zhihong | Beijing, CN | 28 | 50 |
# of filed Patents : 28 Total Citations : 50 | |||
Li, Wenbo | Beijing, CN | 248 | 1080 |
# of filed Patents : 248 Total Citations : 1080 | |||
Lin, Kai | Beijing, CN | 35 | 146 |
# of filed Patents : 35 Total Citations : 146 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H02K Class
- 0 % this patent is cited more than
- 4 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Mar 21, 2025 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Mar 21, 2029 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Mar 21, 2033 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Sep 21, 2021 | P | Publication | |
Sep 01, 2021 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Aug 19, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Jun 01, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
May 26, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Feb 23, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Sep 26, 2019 | P | Published | |
Nov 27, 2018 | F | Filing | |
Nov 27, 2018 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
Nov 05, 2018 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:DU, ZHIHONG;LIN, KAI;LI, WENBO;REEL/FRAME:047587/0224 Owner name: BOE TECHNOLOGY GROUP CO., LTD., CHINA Effective Date: Nov 05, 2018 |
Mar 20, 2018 | PD | Priority Date |

Matter Detail

Renewals Detail
