Positive electrode active material particle powder for non-aqueous electrolyte secondary battery, method for producing same, and non-aqueous electrolyte secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11127940
APP PUB NO 20200119332A1
SERIAL NO

16712161

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Positive electrode active material particle powder includes lithium manganese oxide particle powder having Li and Mn as main components and a cubic spinel structure with an Fd-3m space group. The lithium manganese oxide particle powder is composed of secondary particles, which are aggregates of primary particles, an average particle diameter (D50) of the secondary particles being from 4 μm to 20 μm, and at least 80% of the primary particles exposed on surfaces of the secondary particles each have a polyhedral shape in which each (111) plane thereof is adjacent to at least one (100) plane thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TODA KOGYO CORP.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koga, Kazumichi Yamaguchi, JP 21 142
Masukuni, Hiroaki Yamaguchi, JP 12 73
Matsumoto, Kazutoshi Chiba, JP 32 310

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00