Method for manufacturing isolation structure for LDMOS

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11127840
SERIAL NO

16481576

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a method for manufacturing an isolation structure for LDMOS, the method comprising: forming a first groove on the surface of a wafer; filling the first groove with silicon oxide; removing part of the surface of the silicon oxide within the first groove by means of etching; forming a silicon oxide corner structure at the corner of the top of the first groove by means of thermal oxidation; depositing a nitrogen-containing compound on the surface of the wafer to cover the surface of the silicon oxide within the first groove and the surface of the silicon oxide corner structure; dry-etching the nitrogen-containing compound to remove the nitrogen-containing compound from the surface of the silicon oxide within the first groove, and thereby forming a nitrogen-containing compound side wall residue; with the nitrogen-containing compound side wall residue as a mask, continuing to etch downwards to form a second groove; forming a silicon oxide layer on the side wall and the bottom of the second groove; removing the nitrogen-containing compound side wall residue; and filling the first groove and the second groove with silicon oxide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CSMC TECHNOLOGIES FAB2 CO LTD214028 NO 8 XINZHOU ROAD NATIONAL HI TECH INDUSTRIAL DEVELOPMENT ZONE WUXI JIANGSU WUXI CITY JIANGSU PROVINCE 214028

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Qi, Shukun Jiangsu, CN 10 13
Sun, Guipeng Jiangsu, CN 19 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00