Method of making a pre-sintered preform

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11123796
APP PUB NO 20180311728A1
SERIAL NO

15581678

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making a pre-sintered preform, including forming a pre-sintered preform by a binder jet additive manufacturing technique. The binder jet additive manufacturing technique includes depositing a first powder layer including a first powder and a second powder followed by depositing a first binder at a pre-determined location of the first powder layer. The binder jet additive manufacturing technique also includes depositing a second powder layer over at least a portion of the first powder layer followed by depositing a second binder at a pre-determined location of the second powder layer. At least a portion of the first binder and at least a portion of the second binder is cured forming a green part. The green part is then densified to form a pre-sintered preform near net shape component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cui, Yan Greer, US 229 1510
Kottilingam, Srikanth Chandrudu Greenville, US 217 1526
Schick, David Edward Greenville, US 85 786
Tollison, Brian Lee Honea Path, US 102 439

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 21, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 21, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 21, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00