Cooling device for data center and cooling system for data center

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11122712
APP PUB NO 20200236814A1
SERIAL NO

16296346

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cooling device for data center includes: a housing chamber configured for housing the data center; an air inlet plenum positioned at one side of the housing chamber and configured for inflowing of external natural wind; an air outlet plenum positioned at another side of the housing chamber; an air return plenum defining two opposite ends communicated with the air inlet plenum and the air outlet plenum, and comprising a return air damper; a controller connected to the return air damper and adapted for controlling the opening and closing of the return air damper; and a refrigeration module located in the air inlet plenum and connected to the controller. A cooling system for data center is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN FULIAN FUGUI PRECISION INDUSTRY CO LTDFOXCONN SCIENCE AND TECHNOLOGY INDUSTRIAL PARK EAST SIDE OF MIN QING ROAD LONGHUA SUBDISTRICT SHENZHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Chih-Hung New Taipei, TW 111 1091
Chang, Yao-Ting New Taipei, TW 118 340
Fu, Yen-Chun New Taipei, TW 36 62
Mao, Tze-Chern Neihu, TW 48 270
Wang, Hui-Hsuan Neihu, TW 16 47
Wei, Chao-Ke New Taipei, TW 99 547

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00