Signal conversion device and motor drive system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11121664
APP PUB NO 20200336096A1
SERIAL NO

16817682

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A signal conversion device includes a first signal input terminal, a second signal input terminal, and a detector. A first AC signal is supplied to the first signal input terminal from a signal source. The second signal input terminal is supplied with an in-phase signal that is in phase with the first AC signal and an opposite-phase signal that is opposite in phase with the first AC signal. The second signal input terminal is supplied with a second AC signal whose phase has been switched by a switchover between the in-phase signal and the opposite-phase signal from the signal source. The detector detects, using the supplied first AC signal, whether the supplied second AC signal is the in-phase signal or the opposite-phase signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIDEC SERVO CORPORATION3-93 AIOI-CHO KIRYU-SHI GUMMA-KEN 376-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Silitonga, Charles Simson Halason Kiryu, JP 4 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00