Block copolymer separators with nano-channels for lithium-ion batteries

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11121430
APP PUB NO 20200287188A1
SERIAL NO

16293615

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments disclosed herein generally relate to a microporous separator with a pore geometry that creates a low or no tortuosity architecture. In one embodiment, a battery cell may comprise of an anode layer, a cathode layer, and a separator layer positioned between the cathode layer and the anode layer. The separator layer may be comprised of one or more block copolymers. The block copolymers that make up the separator layer may be materials that self-align into a vertical nanostructure. The vertical nanostructures may allow ions within the battery cell to flow in a vertical path between the cathode and anode. This vertical path my create a low or no tortuosity environment within the battery cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHONGQING JINKANG POWERTRAIN NEW ENERGY CO LTDROOM 503-909 F5 UNIT B1 NO 18 YUETAI ROAD TUZHU TOWN SHAPINGBA DISTRICT CHONGQING 401333

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Campbell, Brennan Santa Clara, US 23 22
Liu, Ying Santa Clara, US 647 4068
Monismith, Scott Santa Clara, US 7 1
Tang, Yifan Santa Clara, US 140 1411

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00