Double breaker switch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11120963
APP PUB NO 20190148096A1
SERIAL NO

16193520

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A double breaker switch comprises a contact bridge connected to an actuator at a connection point, a first fixed contact, and a second fixed contact. The contact bridge includes a first bridge contact connected to the connection point by a first arm and a second bridge contact connected to the connection point by a second arm. The second arm is longer than the first arm. The first bridge contact electrically connects with the first fixed contact at a first contact point in a closed state of the double breaker switch. The second bridge contact electrically connects with the second fixed contact at a second contact point and a third contact point in the closed state of the double breaker switch.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TE CONNECTIVITY GERMANY GMBHAMPERESTRASSE 12-14 BENSHEIM 64625

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ziegler, Titus Berlin, DE 19 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00