Footwear retention system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11116285
SERIAL NO

17220396

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In some embodiments, a footwear ensemble includes (i) a pair of socks, (ii) a pair of press-snap fasteners, (iii) a pair of shoes, and (iv) a pair of tethers. The pair of socks may include a first sock and a second sock, each of which may have a toe compartment and a leg opening opposite the toe compartment. The pair of press-snap fasteners may include a first press-snap connector and a second press-snap connector, each of which may be interchangeable and include a cap/socket portion and a stud/eyelet portion. The pair of tethers may include a first tether and a second tether, each of which may have an anchor end and a retention end. The retention end may include a shoe-retaining mechanism that is configured to releasably secure a shoe in the pair of shoes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHOESPENDER INC217 WOODBURY ROAD UNIT 287 WOODBURY NY 11797

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferrantello, Danielle Cold Spring Harbor, US 3 1
Ferrantello, Frank Cold Spring Harbor, US 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 14, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 14, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 14, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00