Street lamp device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11112092
APP PUB NO 20200318813A1
SERIAL NO

16907124

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A streetlight device includes a power source portion and a lighting portion. The power source portion includes a driving power source, a power source base provided with a receiving space for receiving the driving power source, and a power source upper cover for closing the power source base. The lighting portion is connected at one end of the power source upper cover. The power source upper cover and the power source base are connected with each other through a hinge assembly. The power source upper cover is provided with a power source mounting assembly, and the driving power source is mounted onto the power source upper cover through the power source mounting assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUZHOU OPPLE LIGHTING CO LTDR & D BUILDING A OF OPPLE LIGHTING FENYANG ROAD FEN LAKE DEVELOPING ZONE WUJIANG DISTRICT SUZHOU JIANGSU 215211 215211

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Guoping Shanghai, CN 47 1100
Wang, Hongbo Shanghai, CN 77 309
Wei, Qingjun Shanghai, CN 14 23
Zhu, Zenglong Shanghai, CN 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00