Method for refining plant fibers by steam explosion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11111604
APP PUB NO 20200347548A1
SERIAL NO

16955278

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An industrial system for refining plant fibers by steam explosion includes: a pre-chamber; a loader for loading the pre-chamber with sheaves of a fibrous plant, a spark gap arranged under the pre-chamber, a valve upstream of the pre-chamber, a valve separating the pre-chamber from the spark gap when in the closed state and opening a passage with a diameter of at least the smallest of the diameters of the pre-chamber and the spark gap when in the open state; a washing system arranged inside the spark gap for washing the spark gap and dragging the fibers downwards; a mobile basket for receiving fibers with a position under the spark gap for receiving fibers; a liquid-recovery device, arranged under the basket and under the spark gap, a receiving chamber receiving the basket loaded with fibers; and a drying chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LA CHANVRIERERUE DU GENERAL DE GAULE BAR SUR AUBE F-10200

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dupont, Daniel St Etienne les Remiremont, FR 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00