Device for manufcaturing chopped fiber bundle and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11110622
APP PUB NO 20180186020A1
SERIAL NO

15740114

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for manufacturing a chopped fiber bundle includes a cutter roll provided with one or more disk blades on a circumference of a roll core having a center axis coinciding with a rotation axis of the roll core and a nip roll provided in parallel with the rotation axis of the roll core, to feed a reinforcing fiber yarn to be continuously cut between the nip roll and the cutter roll, further including a rotary drive mechanism that rotates the cutter roll and at least one of: a reciprocating drive mechanism that reciprocates the cutter roll along the rotation axis of the roll core; and a traverse guide that traverses the reinforcing fiber yarn along the rotation axis of the roll core.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TORAY INDUSTRIES INC1-1 NIHONBASHI-MUROMACHI 2-CHOME CHUO-KU TOKYO 103-8666

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noguchi, Yasumoto Shiga, JP 8 39
Suzuki, Tamotsu Shiga, JP 89 676

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 7, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 7, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 7, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00