Downhole device including a fluid propulsion system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11105165
SERIAL NO

16671974

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment of a downhole device includes an elongated body configured to be deployed in a borehole in an earth formation, the borehole including a borehole fluid. The device also includes a propulsion system attached to the body and configured to move the device through the borehole. The propulsion system includes one or more rotor blades configured to generate thrust using the borehole fluid. At least part of the one or more rotor blades is disposed external to the elongated body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER HUGHES OILFIELD OPERATIONS LLC17021 ALDINE WESTFIELD ROAD HOUSTON TX 77073

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harper, Jason M Cypress, US 29 600
He, Zhi Yong Cypress, US 27 50
Loh, Yuh Cypress, US 26 26
Park, Do Seo Houston, US 13 31
Russell, Ronnie Cypress, US 12 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00