Vehicular energy absorbing member and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11104283
APP PUB NO 20200156575A1
SERIAL NO

16685494

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicular energy absorbing member that is disposed between a bumper reinforcement and a framework of a vehicle includes an energy absorbing portion that has a tubular shape and is configured to absorb impact energy by being plastically deformed to be compressed in an axial direction. An outer circumferential surface of the energy absorbing portion has a circular tubular shape and an inner circumferential surface of the energy absorbing portion includes a ridge portion having a shape extending in the axial direction of the energy absorbing portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AISIN SEIKI KABUSHIKI KAISHAKARIYA CITY AICHI PREFECTURE JAPAN'S ASAHI 2 CHOME 1 GA
AISIN KEIKINZOKU KABUSHIKI KAISHA12-3 NAGONOE IMIZU-SHI TOYAMA-KEN 934-8588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kita, Kiyoichi Okazaki, JP 44 449
Matsui, Kyosuke Anjo, JP 14 54
Shibata, Shunji Kariya, JP 11 20
Shobo, Jun Anjo, JP 24 138
Yatsunami, Hiroyuki Kariya, JP 4 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00