Layer board flow mechanism for replenishment of a picking system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11100460
APP PUB NO 20190303844A1
SERIAL NO

16361892

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for replenishing a pick face includes a storage and retrieval machine (SRM) that traverses an aisle of a warehouse and monitors a replenishment position of each pick location of a pick face. The SRM transmits a message to the system indicating which ones of the replenishment positions are empty. The SRM delivers a replenishment load to a pick location that is indicated as empty in the message. Each pick location includes a flow lane configured to direct the motion of package loads sliding down to a picking position of the pick face. The flow lane includes a lever arm assembly that constrains and brakes the motion of package loads sliding down the flow lane. A bar stop of the lever arm assembly constrains a replenishment load, while a retainer bar of the lever arm assembly constrains a forward load. The replenishment load is behind the forward load.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DEMATIC CORP.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blackburn, Christopher Brookfield, US 30 468
Gines, Paul K Kaysville, US 6 26
Stevens, Criston S Layton, US 5 91
Weston, Max Layton, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00