Aircraft having an aft engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11097849
SERIAL NO

16126269

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for operating an electric fan of an aircraft propulsion system includes driving a plurality of fan blades of the electric fan with an electric machine to generate thrust for the aircraft; and driving the electric machine with the plurality of fan blades of the electric fan to generate electrical power subsequent to driving the plurality of fan blades of the electric fan with the electric machine to generate thrust for the aircraft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GENERAL ELECTRIC COMPANY1 NEUMANN WAY MAIL DROP F16 EVENDALE OH 45215-6301

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joshi, Narendra Digamber Schenectady, US 136 1707
Marrinan, Patrick Michael Mason, US 31 460
Miller, Brandon Wayne Liberty Township, US 231 2428
Murrow, Kurt David Springboro, US 71 823
Niergarth, Daniel Alan Norwood, US 104 1081
Pastouchenko, Nikolai N Glenville, US 28 237
Vondrell, Randy M Cincinnati, US 71 852
Yao, Jixian Niskayuna, US 32 113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00