Suspension bicycle frame

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11091219
APP PUB NO 20190283837A1
SERIAL NO

16287121

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bicycle frame includes a front frame assembly and a rear frame assembly pivotably connected to the front frame assembly. The front frame assembly includes a bottom bracket shell, a seat tube extending from the bottom bracket shell toward a saddle support, and a forward shock attachment point statically located on the seat tube between the bottom bracket shell and the saddle support. The rear frame assembly includes a chain stay fork including a chain stay yoke. A chain stay extends from the chain stay yoke to a rear wheel forkend. The chain stay fork includes a rearward shock attachment point statically located on the chain stay yoke. The forward shock attachment point and the rearward shock attachment point cooperate to position a suspension shock between the front frame assembly and the rear frame assembly behind the seat tube.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UWHK LIMITEDNO 7 TIN WAN PRAYA ROAD ROOM 811 HING WAI CENTRE HONG KONG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Parry, George Fort Collins, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 17, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 17, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 17, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00