Operation for 3D beam forming in a wireless communication system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11088737
APP PUB NO 20200259537A1
SERIAL NO

16861584

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Here, operation for 3D beam forming is disclosed. UE, receiving reference signals from one or more base stations (eNBs), may report feedback information comprising precoding matrix information to the one or more eNBs. The precoding matrix information indicates a first type precoding matrix for a horizontal direction and a second type precoding matrix for a vertical direction. eNBs may transmit signals, which are precoded based on a third type precoding matrix for beam forming both on the horizontal direction and the vertical direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ELECTRONICS INC서울 영등포구 여의도동 20 150-721 SEOUL 150-721

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Byun, Ilmu Seoul, KR 218 2257
Cho, Heejeong Seoul, KR 325 3351
Choi, Hyeyoung Seoul, KR 164 2427
Ko, Hyunsoo Seoul, KR 732 7517
Park, Kungmin Seoul, KR 83 440

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00