Dynamoelectric machine control method, dynamoelectric machine control device, and drive system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11088647
APP PUB NO 20200395880A1
SERIAL NO

16961484

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control method includes setting, when a space phase difference of in-phase coils of the respective groups is represented by α, a time phase difference of electric currents to be supplied to the in-phase coils of the respective groups is represented by β, and a time phase difference of carrier frequencies with which the three-phase inverters are PWM-controlled, respectively, is represented by γ, values of β and γ so that any one or both of the following relationships are satisfied: γ=±(α+2β), and γ=±(α−β)/2, based on a result of comparison between a current amplitude of a primary component and a current amplitude of a secondary component of a carrier harmonic current, to control the dynamoelectric machine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kometani, Haruyuki Chiyoda-ku, JP 55 440
Miyama, Yoshihiro Chiyoda-ku, JP 46 194

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00