Switched mode power supply

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11088619
APP PUB NO 20180069476A1
SERIAL NO

15795439

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switched mode power supply comprises a control signal generator arranged to generate first and second control signals via first and second outputs, respectively, which are coupled to respective first and second inputs of a switching stage, by means of respective first and second control signal paths. The switching stage is arranged to, responsive to the first and second control signals, alternately charge and discharge the reactive element by coupling it alternately to first and second supply voltages. An adjustable delay stage in one of the first and second signal paths is arranged to control an adjustable delay so that a first delay experienced by the first control signal passing from the control signal generator's first output to the switching stage's first input is substantially equal to a second delay experienced by the second control signal passing from the control signal generator's second output to the switching stage's second input.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)164 83 STOCKHOLM SWEDEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koli, Kimmo Turku, FI 19 184
Peltonen, Janne Salo, FI 8 13
Vilhonen, Sami Lieto, FI 38 186

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00