Secondary battery and battery module

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11088398
APP PUB NO 20210036379A1
SERIAL NO

16965415

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to a secondary battery and a battery module. The secondary battery includes: a casing including a receiving cavity and an opening which is in communication with the receiving cavity; an electrode assembly housed in the casing; a first top cover plate, which covers the opening and is connected with the casing, the first top cover plate including an insertion portion extending into the casing and an exposed portion disposed outside the casing; and a sealing member; the casing is provided with a first through hole, the insertion portion is provided with a second through hole, the second through hole includes an inlet which is in communication with the first through hole and an outlet which is in communication with the receiving cavity, and the sealing member is connected to the casing and seals the first through hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONTEMPORARY AMPEREX TECHNOLOGY (HONG KONG) LIMITEDHONG KONG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Zhijun Ningde, CN 126 236
Wang, Peng Ningde, CN 1419 6748
Zhang, Jie Ningde, CN 1052 8750
Zhou, Yong Ningde, CN 177 1511

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00