Mirror, in particular for a microlithographic projection exposure apparatus or an inspection system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11086055
APP PUB NO 20190339428A1
SERIAL NO

16514006

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mirror, in particular for a microlithographic projection exposure apparatus or an inspection system, having a mirror substrate (205), a reflection layer (220), which is configured to have a reflectivity of at least 50% for electromagnetic radiation of a predefined operating wavelength that is incident on the optically effective surface (200a) of the mirror at an angle of incidence of at least 65° relative to the respective surface normal, and a barrier layer system (210), which is arranged between the reflection layer and the mirror substrate and has a sequence of alternating layer plies composed of a first material and at least one second material. The barrier layer system reduces penetration of hydrogen atoms that would otherwise penetrate the mirror substrate by at least a factor of 10.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARL ZEISS SMT GMBHRUDOLF-EBER-STRASSE 2 OBERKOCHEN 73447

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huber, Peter Heidenheim, DE 68 645

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00