Prime movers, pumps and compressors having reciprocating vane actuator assemblies and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11085300
SERIAL NO

15946147

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Prime movers are provided that can include: a fixed member in operational relationship to a rotating member; a reciprocating vane assembly operationally engaged with the rotating member; and a track member about the rotating member and engaging the reciprocating vane assembly. Engines are provided that can include: a stator in operational relationship to a rotor; a reciprocating vane assembly operationally engaged with the rotor; and a track member about the rotor and engaging the reciprocating vane assembly. Processes for powering a prime mover are also provided, the processes can include engaging vanes between a fixed member and rotating member to create compression and expansion zones, the engaging comprising guiding the vanes from a track member about the rotating member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REGI U S INC7520 N MARKET ST SUITE 10 SPOKANE WA 99217

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grisar, Robert Ruskin, US 3 18
MacKnight, Allen Signal Hill, US 5 66
Porter, Paul Colbert, US 8 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00