Cross-laminated timber having a conduit therein

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11084245
APP PUB NO 20200215784A1
SERIAL NO

16243711

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A cross-laminated panel including a first layer, a second layer, and a third layer. The first layer of the cross-laminated panel having first boards oriented in a first direction. The second layer of the cross-laminated panel having second boards oriented in a second direction, the second direction being substantially perpendicular to the first direction. The third layer of the cross-laminated panel having third boards oriented in the first direction. The cross-laminated panel also including adhesive situated between each of the first layer, the second layer, and the third layer. The cross-laminated panel further including a hollow member forming a conduit and disposed in any one of the first layer, the second layer, and the third layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FOUR SIDED SOLUTIONS LLC2525 E 29TH AVE STE 10B #208 SPOKANE WA 99223

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bradley, Michael Ryan Spokane, US 5 5
Kuhn, Tyler Valentine Spokane, US 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 10, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 10, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 10, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00