Methods and systems for managing facility power and cooling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11076507
APP PUB NO 20190008072A1
SERIAL NO

16019052

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are provided for determining data center resource requirements, such as cooling and power requirements, and for monitoring performance of data center resource systems, such as cooling and power systems, in data centers. At least one aspect provides a system and method that enables a data center operator to determine available data center resources, such as power and cooling, at specific areas and enclosures in a data center to assist in locating new equipment in the data center.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC IT CORPORATION70 MECHANIC STREET FOXBORO MA 02035

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bock, Morten Broager, DK 3 154
Dalgas, Mikkel Winchester, US 18 1103
Giaquinto, Todd J Cumberland, US 8 394
Hammond, Brad T North Kingstown, US 5 298
Ives, Edward M Exeter, US 9 217
Morgan, Jane E Glasnevin, IE 6 218
Rasmussen, Neil Concord, US 47 4385
VanGilder, James William Pepperell, US 30 177

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 27, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 27, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 27, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00