Gate driving circuit and display device including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11074842
SERIAL NO

16433350

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gate driving circuit includes a plurality of stages connected to one another, wherein each of the plurality of stages includes an output unit which outputs a first clock signal as a gate voltage in accordance with a voltage of a Q node and a voltage of a QB node; a first node control unit which controls the voltage of the Q node; and a second node control unit which controls the QB node, wherein the first node control unit includes second and third transistors which discharge the Q node, the second transistor outputs a ground voltage to the Q node in response to a second clock signal, and the third transistor outputs the ground voltage to the Q node in response to the voltage of the QB node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG DISPLAY CO LTDSEOUL SOUTH KEREAN SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Seeung Bucheon-si, KR 9 233
Park, Chansoo Goyang-si, KR 12 210

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 27, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 27, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 27, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00