Framing assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11072927
SERIAL NO

17019275

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A framing assembly has a plurality of modified splines, a plurality of modified panels, and at least one surface attachment member for constructing the frame of a building structure having interior exposed beams. The plurality of splines are rafter splines, extended rafter splines, or wall splines. Each spline has a support member and a pair of flanges abutting a lower portion of the support member. At least one surface attachment member is attachable to a lower portion of each spline as a decorative feature. The panels are modified structural insulated panels (SIPs) coupled to at least one of the splines to form a wall section, a ceiling section, or a roof section. Once assembled, the SIPs outer skin forms a continuous backing for the remaining exterior (or outer) wall or ceiling treatment. The splines not only support the modified SIPs, but also support the roof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FREIN THOMAS GMIDWAY AR

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frein, Thomas G Midway, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 27, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 27, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 27, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00