Container wall with fusible material and method for adding the fusible material to the container wall

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11072481
APP PUB NO 20150314943A1
SERIAL NO

14796186

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metallic product compartment of a single-use, self-heating container has melted onto one or more of its surfaces and re-solidified a shaped fusible material containing a reaction suppressant. A method of manufacturing includes providing the product container, positioning the fusible material, as a solid, in contact with a metallic wall of the container, heating at least a portion of the metallic wall with an electromagnetic induction heater to at least partially melt a portion of the fusible material, and enabling the melted portion of the fusible material to cool and re-solidify, thereby adhering the fusible material to the metallic wall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEMPRA TECHNOLOGY INC6140 15TH STREET E BRADENTON FL 34203

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bolmer, Michael Sheppard Maple Grove, US 11 79
Paul, Zbigniew R University Park, US 5 30
Sabin, Cullen M Bradenton, US 44 573

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 27, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 27, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 27, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00