Circuit module, bicycle electric component, and communication system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11070252
APP PUB NO 20190103895A1
SERIAL NO

16135888

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To provide a circuit module, a bicycle electric component, and a communication system that are easily matched to a communication system that uses power line communication, a circuit module is configured to be mounted on a bicycle electric component. The circuit module includes a first circuit board, a communication converter configured to convert between information appropriate to power line communication and information appropriate to communication other than the power line communication and mounted on the first circuit board, and a plurality of first terminals formed on the first circuit board. The plurality of first terminals is connected to a second circuit board included in the electric component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIMANO INCOSAKA JAPAN OSAKA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishikawa, Yuichiro Sakai, JP 27 100
Kuroda, Mao Sakai, JP 12 302
Numata, Fumihide Sakai, JP 8 26
Suzuki, Takafumi Sakai, JP 148 835

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 20, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 20, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 20, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00