High-power battery-operated power tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11063548
APP PUB NO 20200162011A1
SERIAL NO

16578984

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power tool is provided including a power supply interface receiving a medium-voltage-rated removable battery pack having a maximum rated voltage in the range of 40 to 80 volts, and a brushless direct current (BLDC) motor. The motor includes a rotor and a stator having at least three stator windings corresponding to at least three phases of the motor, the rotor being moveable by the stator when the stator windings are appropriately energized within the corresponding phases, each phase being characterized by a corresponding voltage waveform energizing the corresponding stator winding. A multi-phase inverter bridge circuit is disposed between the power supply interface and the motor, and a controller is configured to output drive signals to the inverter bridge circuit to control flow of current from the battery pack to the motor such that the motor produces a maximum power output of at least 2500 watts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLACK & DECKER INC1000 STANLEY DRIVE NEW BRITAIN CT 06053

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cox, John D Lutherville, US 71 1199
Forster, Michael K White Hall, US 75 1814
Gorti, Bhanuprasad V Perry Hall, US 56 2073
Seman,, Jr Andrew E Pylesville, US 99 5574
Vanko, John C Timonium, US 55 1258
Velderman, Matthew J Baltimore, US 115 1362
White, Daniel J Baltimore, US 163 5951

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 13, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 13, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 13, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00