Industrialised production process of total nutrient pure powdered sugar and liquid syrup and equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11060154
APP PUB NO 20200115768A1
SERIAL NO

16083707

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a production process for powdered sugar and liquid syrup, comprising the steps of primary pressing sugar cane juice extraction, three-stage physical filtration, and sugar boiling, wherein the step of the three-stage physical filtration respectively uses a sieve plate, a bagasse separator and a micro-filtration membrane for filtration. The bagasse separator comprises a screen cylinder transversely arranged inside a separation bin. The inlet and outlet of the screen cylinder are respectively connected to a feeding bin and a discharging bin. A juice outlet and a bagasse outlet are respectively provided under the separation bin and the discharging bin. A propeller blade component is provided inside the screen cylinder. The propeller blade component is formed by combining vertical mixing blades with helical blades.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GUANGXI YEMAO DRINKING & FOOD CO LTDROOM 401 ZHONGNUO INDUSTRIAL BUILDING NO 62 GAOXIN AVENUE GAOXIN DISTRICT NANNING GUANGXI 530007

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jia-Quan Nanning, CN 1 0
Huang, Hai-Xin Nanning, CN 1 0
Qin, Bo Nanning, CN 45 323
Wei, He-Guang Nanning, CN 1 0
Ye, Li-Na Nanning, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 13, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 13, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 13, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00