PVT compensated delay cell for a monostable

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11057022
APP PUB NO 20200412344A1
SERIAL NO

16454872

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A monostable circuit includes a delay cell with a reference generator generating a reference current based upon a PVT invariant resistance and a threshold voltage, and a delay block with an output capacitor and an output circuit altering an amount of charge stored on the output capacitor as a function of the reference current, in response to an input signal. An inverter has an input coupled to the output circuit. A logic circuit logically combines output of the inverter and the input signal to generate a monostable trigger pulse. The output circuit includes a current source sourcing the reference current to the output capacitor in response to a first logic state of an input signal, and a current sink sinking current from the output capacitor to discharge the output capacitor, in response to a second logic state of the input signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STMICROELECTRONICS S R LVIA C OLIVETTI 2 AGRATE BRIANZA (MB) 20864

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tajfar, Alireza Leuven, BE 11 13
Zamprogno, Marco Cesano Maderno, IT 48 236

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 6, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 6, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 6, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00