Lithium compound, method for producing the lithium compound, and method for producing positive active material for nonaqueous electrolyte secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11056688
APP PUB NO 20190312273A1
SERIAL NO

16308065

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lithium compound with which a positive active material containing a decreased amount of magnetically attractable substances can be easily obtained while shortening the total time for production of a positive electrode for a nonaqueous electrolyte secondary battery. The lithium compound is used for producing a positive active material for a nonaqueous electrolyte secondary battery, with which a lithium transition metal composite oxide can be obtained by mixing the lithium compound with a transition metal composite hydroxide or the like obtained by crystallization reaction. A positive active material in which the amount of magnetically attractable substances contained is 0.02 mass ppm or less can be easily obtained while shortening the total time for production of the positive active material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO METAL MINING CO LTD11-3 SHIMBASHI 5-CHOME MINATO-KU TOKYO 105-8716

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asakawa, Takeshi Niihama, JP 12 106
Tagami, Azusa Niihama, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 6, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 6, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 6, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00