X80 pipeline steel with good strain-aging performance, pipeline tube and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11053563
APP PUB NO 20180073094A1
SERIAL NO

15559048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A X80 pipeline steel with good strain-aging performance comprises (wt. %): C: 0.02-0.05%; Mn: 1.30-1.70%; Ni: 0.35-0.60%: Ti: 0.005-0.020%; Nb: 0.06-0.09%; Si: 0.10-0.30%; Al: 0.01-0.04%; N≤0.008%; P≤0.012%; S≤0.006%; Ca: 0.001-0.003%, and balance iron and unavoidable impurities.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAOSHAN IRON & STEEL CO LTD201900 NO 885 FUJIN ROAD SHANGHAI BAOSHAN DISTRICT SHANGHAI CITY SHANGHAI CITY 201900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bai, Mingzhuo Shanghai, CN 1 0
Sun, Leilei Shanghai, CN 4 5
Wu, Kougen Shanghai, CN 4 2
Xu, Guodong Shanghai, CN 25 49
Xu, Haisheng Shanghai, CN 12 115
Zheng, Lei Shanghai, CN 153 1088

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 6, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 6, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 6, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00