Conveyance amount controlling apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11052916
APP PUB NO 20190092338A1
SERIAL NO

16036280

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conveyance amount controlling apparatus includes a control state detector, a road surface state detector, and at least one conveyance amount controller including a conveyance device conveying, to a driver, information representing a road surface state and a conveyance amount controlling device controlling a vibration conveyance amount as a conveyance amount of a vibration caused by a road surface irregularity. A second conveyance amount, as the vibration conveyance amount obtained when a road surface state amount less than a first threshold is detected by the road surface state detector, is less than a first conveyance amount, as the vibration conveyance amount obtained when execution of an automatic driving control is not detected by the control state detector. A third conveyance amount, as the vibration conveyance amount obtained when the road surface state amount equal to or greater than the first threshold is detected, is greater than the second conveyance amount.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUBARU CORPORATION1-20-8 EBISU SHIBUYA-KU TOKYO 1508554 ?1508554

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsukasaki, Yuichiro Tokyo, JP 20 154

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 6, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 6, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 6, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00