Prevention of the emission of hydrogen sulphide in the production of hot bitumen or asphalt

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11046895
APP PUB NO 20200157438A1
SERIAL NO

16611230

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present application relates to a method to prevent the emission of hydrogen sulphide in the production of hot bitumen or asphalt having a temperature of between 150 and 200° C., wherein the method comprises the steps of providing a bituminous or asphalt mixture, heating the mixture until a temperature of between 150-200° C. and adding an aqueous calcium nitrate solution or a calcium nitrate powder while mixing the bituminous or asphalt mixture. The present application furthermore relates to the use of an aqueous calcium nitrate solution or a calcium nitrate powder during mixing of a bituminous or asphalt mixture in the production of a hot bitumen or asphalt having a temperature of between 150 and 200° C. to prevent the emission of hydrogen sulphide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YARA INTERNATIONAL ASADRAMMENSVEIEN 131 0277 OSLO NORWAY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brekke, Dahl Thommesen Hilde Stathelle, NO 1 0
Franke, Wolfram Porsgrunn, NO 18 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 29, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00