Catalyst guard
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jun 22, 2021
Grant Date -
Nov 8, 2018
app pub date -
Nov 8, 2017
filing date -
Nov 8, 2016
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A furnace system features a combination of a furnace, a main combustion furnace tube and a disposable guard tube. The main combustion furnace tube is configured to couple and extend from the furnace, made of a quartz tube material, and has a zone for a combustion catalyst or high temperature support configured or formed therein. The disposable guard tube is coupled to the main combustion furnace tube, has a top opening configured to receive and have direct exposure to a liquid sample being injected into the main combustion furnace tube, and also has a bottom opening to provide the liquid sample to the main combustion furnace tube for processing in the zone for the combustion catalyst or high temperature support.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
O I CORPORATION | 151 GRAHAM RD COLLEGE STATION TX 77845 |
International Classification(s)

- 2017 Application Filing Year
- G01N Class
- 13595 Applications Filed
- 8906 Patents Issued To-Date
- 65.51 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Bauman, Noel C | College Station, US | 6 | 9 |
# of filed Patents : 6 Total Citations : 9 | |||
Killgore, Joan Zarate | Iola, US | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 | |||
Slaton, James G | College Station, US | 1 | 0 |
# of filed Patents : 1 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- G01N Class
- 0 % this patent is cited more than
- 4 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Dec 22, 2024 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Dec 22, 2028 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 22, 2032 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Jan 08, 2025 | MAFP | MAINTENANCE FEE PAYMENT | free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY year of fee payment: 4 |
Sep 07, 2021 | P | Publication | |
Aug 18, 2021 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Aug 03, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Jul 14, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: AWAITING TC RESP., ISSUE FEE NOT PAID |
Jun 04, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
May 28, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Apr 09, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Feb 24, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Oct 23, 2020 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: FINAL REJECTION MAILED |
Apr 23, 2020 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Jan 15, 2020 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Oct 22, 2019 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Sep 05, 2019 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: APPLICATION DISPATCHED FROM PREEXAM, NOT YET DOCKETED |
Mar 21, 2019 | P | Published | |
Sep 05, 2018 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
Sep 05, 2018 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: APPLICATION UNDERGOING PREEXAM PROCESSING |
Sep 03, 2018 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ZOU, XIAOHONG;REN, XIANGSHENG;GAN, WANHUI;REEL/FRAME:046792/0048 Owner name: GUANGDONG EVERWIN PRECISION TECHNOLOGY CO., LTD., CHINA Effective Date: Sep 03, 2018 free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ZOU, XIAOHONG;REN, XIANGSHENG;GAN, WANHUI;REEL/FRAME:046792/0048 Owner name: GUANGDONG EVERWIN PRECISION TECHNOLOGY CO., LTD., Effective Date: Sep 03, 2018 |
Mar 22, 2017 | F | Filing | |
Mar 28, 2016 | PD | Priority Date |

Matter Detail

Renewals Detail
