Additive manufacturing apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11040489
APP PUB NO 20190118468A1
SERIAL NO

15788037

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An additive manufacturing apparatus includes an energy beam source adapted to emit an energy beam, and a component building area including a base extendable between and vertically movable relative to opposed walls. The component building area includes a platform supported by the base and extendable between the walls, the platform having a layer onto which powdered material is applied, the powdered material being melted or sintered by the energy beam to form a component. The component building area includes an articulation device for rotating the platform about a horizontal axis, and a powder recovery arrangement. The apparatus includes subsequent to formation of the component, the articulation device rotating the platform about the horizontal axis for collecting loose powder by the powder recovery arrangement by virtue of gravity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE INFRASTRUCTURE TECHNOLOGY LLC300 GARLINGTON ROAD GREENVILLE SC 29615

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bobar, Adnan Birr, CH 2 13
Haro, Juan Vicente Birr, CH 2 15
Schwerdtfeger, Jan Baden, CH 1 11
Swanner,, Jr Archie Greenville, US 1 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00