Power supply device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11038415
APP PUB NO 20200076293A1
SERIAL NO

16679353

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a power supply device, a first switching power supply is disposed in a first power line connecting a receiver for receiving power from an external power supply and the power storage device and converts the power received from the external power supply to supply it to the power storage device. A second switching power supply is disposed in the second power line including a first end connected the first power line at a branch point, and a second end connected to the load device, and converts the power received from the power storage device to supply it to the load device. The first noise removal filter is disposed between the branch point and the power storage device in the first power line. The second noise removal filter is disposed between the branch point and the second switching power supply in the second power line.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC AUTOMOTIVE SYSTEMS CO LTD4261 IKONOBE-CHO TSUZUKI-KU YOKOHAMA-SHI KANAGAWA 2248520 ?2248520

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chizuwa, Shuhei Tokyo, JP 13 14
Mochizuki, Kento Tokyo, JP 12 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 15, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 15, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 15, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00